Check both the finished-room clearance and the temporary space needed for assembly.

In short: measure the route for the largest panel, not only the final room footprint.

Allow for doorway width and height, corners, stairs, lifts and unloading equipment. Around the finished enclosure, typical planning values are at least 50 mm at side and rear surfaces and about 400 mm above, but the refrigeration-unit manual may require more. Assembly may need roughly 200 mm or more beside walls for people and tools.

Keep access to controllers, drains, access panels and condenser coils. Do not trap a serviceable component between the room and the building.

Clearances

Two separate requirements are usually merged into one number here. They are not the same thing, so they are set out separately below: the minimum safety distances the manufacturer specifies for the finished room, and the working space an installer needs to build it.

Minimum safety distances — MTH specification

MTH specifies minimum safety distances from side walls, other equipment, and heat sources, so that the room operates correctly and air can recirculate properly around it.

PositionMTH minimum
A — Above (top)400 mm (40 cm)
B — Side / rear50 mm (5 cm)
C — Door sideDepends on the door selected

Important: MTH states these minimum safety distances for a cold room without a refrigeration unit. A monobloc mounted on the room, or a split condenser sited nearby, has its own clearance and airflow requirements — take those from the refrigeration unit's own manual, supplied with the room.

Installation working space — recommendation, not a manufacturer requirement

Safety distances describe what the finished room needs. Building it needs more room than that: a panel has to be carried in, offered up to its neighbour, aligned, and locked. As a planning figure, allow at least 200 mm to the walls on each side and 300 mm above the planned roof height. Treat these as an installation recommendation — the MTH figures above are the ones that must be met.

Cam-lock panels are secured from inside, and the room is serviced from above (inspection hatch), inside, or at the outdoor condenser — so wide working aisles are not needed.

ItemAllowPurpose
Gap to walls (all sides)200 mmWorking space — panels lock from inside; service from above, inside, or at the condenser
Height clearance300 mm above planned roof heightLifting and seating ceiling panels
Panel stagingFlat area to lay panels downNever store panels standing on edge for long periods — they bow
Delivery accessMeasured route to the sitePanels must physically reach the spot — check doorways, corridors, and lift dimensions
Two clearance zones MTH minimum vs working space — plan and side view of a cold room, each zone labelled in text: zone 1 (solid) is the MTH minimum for the finished room without a refrigeration unit, 50 mm at the sides and back, 400 mm above the roof and, on the door side, the 700 / 900 mm leaf arc; zone 2 (dashed) is the recommended working space during assembly, 200 mm to the walls and 300 mm above the roof. A unit icon notes that the unit's clearances follow its own manual; an inset shows panels stored flat, not on edge.
Clearances: MTH minimum vs working space

Where the room may be installed

The clearances only matter if the location itself is suitable. MTH sets out the following conditions for the room the cold room stands in:

  • Controlled temperature and humidity. The installation room must have a suitable, controlled temperature and humidity, so the unit does not malfunction and condensation does not form.
  • Sufficient air exchange — including out of hours. There must be enough air exchange in the installation room also during periods when the premises are closed. A refrigeration unit rejects heat continuously; a sealed back room that is fine during trading hours can still overheat overnight or over a shutdown.
  • Not outdoors. Do not install the cold room outdoors, in places directly exposed to the weather.
  • Not in hazardous or ATEX zones. Do not install in hazardous areas and/or areas classified as ATEX (explosive atmospheres).
  • Supporting surface. The floor the room stands on must be flat and level, with a load capacity calculated by a specialist for the mass and maximum load of the unit.

Clearance and installation-environment figures on this page are taken from the MTH Algor installation and maintenance manual. Download the documents

Don't skip the delivery-access check

The delivery-access check is the one most often skipped. Measure the narrowest point on the route — every doorway, corridor turn, and goods lift — against the largest panel before the lorry is booked. A panel that cannot reach the room is a build that stops on delivery day.

Delivery route plan — top-view of a corridor and goods lift with the largest panel dimension overlaid at the narrowest pinch point, plus the room showing the 200 mm installation working-gap ring.
Delivery route, pinch point & wall gap

Not sure your access route fits the panels? Send your floor plan and largest panel size and we'll check it — contact [email protected].